Friction hoists

Friction hoists are designed for rock hoisting, quick and safe hoisting people, transportation of timber , mining equipment and materials. Inspection and repair of shaft reinforcement and lining is also performed by means of mine hoists.

Friction hoists are divided according to loading level of head ropes  by the action of end force on the mine hoist. There are single-rope and multi-rope (up to eight ropes of carrying set) hoists which can be equipped both with geared and gearless drives.

To hoist heavy loads from deep mines by means of bucket, cage and single conveyance counterweight hoisting, multi-rope mine hoists are mainly used. Single-rope friction hoists  are notable for compact design and narrow width. These hoists, however, are not used in mine construction, but only in some auxiliary hoists of operating mines.

Friction hoists are located directly above the mine shaft, on tower headframe (of MR type (multi-rope)) or installed in surface building at a certain distance from the shaft (CGP type hoists (cylindrical ground pulleys)). Сircuit design and layout of mine hoists of various standard sizes of CP-series are identical to MR-series hoists, but the design of their units is more perfect. Multi-rope mine hoists of MR-series are equipped with spring loaded pneumatic brake. CP-series hoists are equipped with hydraulic disc brakes.

Multi-rope hoists can be equipped with one and two engines (depending on selection of the mine hoist and calculations performed) and two types of brakes: radial shoe or hydraulic disc ones.

WE CONSIDER MANUFACTURING OF ANY STANDARD SIZES, VERSIONS OF HOISTS OF THIS TYPE.

Technical characteristics CShN 5Х4 un 5х6 nb 5х8 gv 4х4 nb 3,25х4 кn
Location of equipment Surface Surface Headframe Surface Surface
Type of winding tool КVSh КVSh КVSh КVSh КVSh
Diameter of winding tool ,mm 5000 5000 5000 4000 3250
Number of ropes 4 6 8 4 4
Capacity, tn 25 40 50 15 10
Max. hoisting velocity, m/s 12 16,5 16,5 12 9,4
Motor power, кW 2х1600 2х4000 2х5500 1600 1000
Hoist height, m 1538 1032 1375 1070 1130
Brakes type Hydraulic disc
Design

The process of mine hoists design starts with study and verification of initial technical requirements submitted by a customer. Uralmashplant engineering center is equipped with modern software, which allows us to reduce the cycle of mine hoists design and increase the efficiency and quality of the design.

The next stage is the calculation of loads on mine hoist mechanical equipment, drives and brakes. We pay particular attention to this process. The specialists of engineering calculations and analysis center perform calculations for static, dynamic and fatigue strength of mine hoists equipment, by means of modern software platforms, using finite element method. Engineering calculations allow us to simulate processes and operation and identify the areas of maximum stresses, fatigue limit of a part, predict the service life of mine hoists.

Production

Mine hoists parts are domestically manufactured by Uralmashplant, including the use of the advanced machining centers by leading global manufacturers. The materials used for manufacturing of main units and parts of mine hoists are similar or surpass the known analogues. Every part of mine  hoist is controlled at all stages of designing and manufacturing. We use a number of original designs and process solutions in сourse of manufacturing of our structures.

Testing

We test all manufactured mine hoists at a specialized workbench with the participation of representatives of customer company in compliance with the developed program and methodology.

Traction sheave made of welded structure.

The sheave consists of two halves fastened with high-strength fasteners

Headframe sheave

Traction sheave assembled with shaft

Main shaft

Made of forging

Traction sheave assembly

Skip main view

Rock discharge hopper

Electric motor of traction sheave drive

Cage

Production and operation statistics

Manufactured

In operation

Manufactured since 2017

Company Quantity Version Conveyance type Location Year of putting into operation
“Gaiskiy GOК” PJSC (UMMC) 1 5х8 гв Skip Headframe 2019

Request a quotation

Fill-in the inquiry form and we will send a reply to the e-mail address indicated.